TECHNICAL DATA:

MONTAGE PIPELINE PE 100 SDR 11 BETWEEN DIAMETERS DN 125 AND DN 250 – 24,760 LM
BRANCHING PIPELINE PE 100 SDR 11 BETWEEN DIAMETERS DN 32 AND DN 63 – 21,935 LM
WELDING PROCESS CARRIED OUT BY “BUTT” AND ELECTROFUSION 

PROJECT :

REPLACEMENT GAS PIPELINE AND CONNECTIONS WITHIN THE NEAG
BRIDGE ASSEMBLY – GHERASE SOS – SOS COLENTINA – MRS. GHICA.
HELEN STREET – THE HOUSE, JUNCTION WITH SHIP STREET REPLACEMENT GAS PIPELINE AND CONNECTIONS WITHIN THE NEAG BRIDGE ASSEMBLY – GHERASE SOS – SOS COLENTINA – MRS. GHICA.
COLENTINA STREET – REAR BLOCKS LITOVOI INTERSECTION WITH PRINCE STREET
REPLACEMENT OF NATURAL GAS PIPELINE AND CONNECTIONS WITHIN RAVOHA ENSEMBLE
STREET EXTENSION GHENCEA-AREA VACANT LAND, WIRE IS MOUNTED NEAR THE SOS EXTENSION GHENCEA
REPLACEMENT OF NATURAL GAS PIPELINE AND CONNECTIONS WITHIN CREMENEA ENSEMBLE – GHERASE SOS – SOS COLENTINA – PREDEAL STR.
STREET SINAIA – THE BLOCKS, CROSSING THE STREET AND MRS. SOS GHERASE GHICA
TECHNOLOGICAL NODE ADJUSTMENT, ODORIZATION AND MEASUREMENT FOR DN500 – HIGH PRESSURE – BUCIUMENI
BENEFICIARY: SNTGN „TRANSGAZ”SA